Key Features (Bullet Points)
Here’s a clean, sharp feature list you can use anywhere:
• Built-in GPS tracking with real-time location updates
• 2-way communication for instant calling between user and guardian
• Dedicated panic/SOS button for emergency alerts
• Slim ID-card design for schools, offices, and personal safety
• No installation required — ready to use out of the box
• Geo-fencing alerts for safe zone entry/exit
• Route history and playback to review movement
• Low-battery alerts for uninterrupted safety
• Compatible with Android and iOS tracking apps
Brand: Exohive Digital™
Introducing the Exohive Digital™ 2G ID Card Tracker GPS Device – your all-in-one solution for safety, security, and peace of mind.
Whether you want to protect loved ones, secure valuables, or track assets, this compact device delivers powerful tracking capabilities with ease.
📍 Track Anything, Anytime – Place it in a bag, attach it to clothing, or hide it in valuable items to monitor their location in real-time via a simple mobile app.
💡 Perfect For:
📦 What’s Included:
💰 Renewal Charges: ₹1799/year for app subscription & SIM data pack.
With the Exohive Digital™ 2G ID Card Tracker, you’re always just a tap away from knowing exactly where your loved ones or valuables are — anytime, anywhere.
Â
Dash Cam (Full HD, Real-Time Tracking)
The Exohive Digital™ Dash Cam is the ultimate vehicle security and monitoring device for car owners, fleet managers, and travel enthusiasts. This innovative 2-in-1 dash camera + GPS tracker not only records your journeys in Full HD 1080p but also provides real-time location tracking with advanced security alerts – all accessible from your smartphone via a powerful mobile app.
Whether you want proof in case of accidents, 24/7 vehicle monitoring, or driver behavior tracking, this dash cam is your reliable road companion.
Â
Premium Features:
Â
Why Exohive Digital™ Dash Cam Stands Out:
Â
Technical Specifications:
Â
Package Includes:
Â
🚗 Drive Safer. Smarter. More Secure.
Order your Exohive Digital™ Dash Cam today and experience peace of mind on every journey!
Â
Â
Rate this product?
1 Reviews
Raj Sep 30, 2025 at 8:46 AM